About 3DFS
3DFS is an employee-owned company in Pittsboro, North Carolina. We design and build solid-state power controllers that connect in parallel at a distribution panel, measure the current as it moves and correct it within one cycle. The method is called Software-Defined Electricity.
Formed
2010
Home
Pittsboro, North Carolina
In production
VectorQ2 and VectorQ5
Why We Exist
Electricity is the most successful invention in human history, and its story is unfinished. About two thirds of the energy America uses never becomes work. The national ledger calls it rejected energy, and for a hundred years nobody could see where it went. We spent fifteen years building instruments that see it and controllers that correct it, at the panel, in millionths of a second.
Let me tell you that story. Come write the ending with us.
Read the full text
But this story has a missing chapter. Of all the energy America turns into electricity, roughly two thirds never becomes work. It sits in the national ledger under one quiet line: rejected energy. Two thirds. And for a hundred years, nobody could say exactly where it went.
Not because nobody cared. Because nobody could see. Electricity lives in millionths of a second, and the finest instruments in the world could only glimpse it in passing. The engineers who built the grid did something magnificent with the sight they had. The waste was never a failure of care. It was a limit of vision.
We got curious about that missing chapter. So we went digging, back through federal records to the 1950s. And there, in the old files, the loss had a name: electrical systems energy losses. Not generation losses. The systems themselves. The waste was not dying at the power plant, the way everyone assumed. It was scattered through the wires, the panels, and the machines, hiding in the one place nobody could look: the space between the moments a meter can measure.
So we spent fifteen years building the thing that could look. Instruments fast enough to watch electricity as it truly moves, and controllers fast enough to correct it as it flows, in millionths of a second, at the panel. The first time we switched one on and watched a circuit come clean, we understood why this chapter had waited a hundred years to be written. What was invisible for a century is invisible no longer. And waste you can see, you can end.
Who are we? Engineers. Employee-owned, and proud to call North Carolina home, where we design and build everything we sell. We did not start this company to find an exit. We started it to find a fault. And when doubt came looking for us, we welcomed it, because doubt is how this industry stays honest. We ask no one for faith. We ask only for a fair measurement.
Here is how the story ends. It ends in a factory where the motors run their full lives, and no one remembers when that was rare. It ends in a data center that takes the fault and never blinks. It ends on a ship that keeps its power. And it ends in the ledger itself, when rejected energy becomes a falling number, until that quiet line reads like the name of a cured disease.
That ending is not written yet. It will not be written by luck, and it cannot be written alone. It gets written the way the grid itself was built: hand over hand, one facility, one panel, one honest measurement at a time.
So this is our pledge, and our invitation. All we ask of you is your doubt, and one honest measurement. You have nothing to lose but the losses.
What we make

The controllers
Solid-state power controllers that connect in parallel at a distribution panel, with no change to the existing wiring. VectorQ2 and VectorQ5 are in production.
Read more Products

The method
Software measures the current as it moves, not as an average after the fact. Harmonics, power factor, phase imbalance and impedance mismatch are corrected together, because they are one distorted current.
Read more Technology

Where it is used
In facilities with motor-heavy or nonlinear loads, a low power factor draws extra current and harmonics heat the motor windings. Utilities also charge for a power factor under 0.90. Each sector we work in has its own page.
Read more Solutions
Where electricity is lost

United States energy consumption in 2024, from the July 2026 edition of the chart by Lawrence Livermore National Laboratory and the Department of Energy. It is the latest edition published. The charts for 2025 and 2026 are not yet available.
This chart formed our company in 2010. We saw the grey box called Rejected Energy, bigger than all the energy the nation puts to work, and asked why. The stream feeding it once carried a name, electrical system energy losses. The name was dropped, and the box became rejected energy. The common answer was thermal losses at the plant. We believe that loss deserves its name back. You deserve to know where your electricity goes, and to do something about it.
The line that lost its name
58.6%
of the energy that went into making electricity in 2024 was gone before it reached a customer. That is how much is lost: 19.21 of 32.77 quads.
Each year the national energy chart draws the country’s energy as a river. Electricity loses more than half its input before a customer sees any. The chart shows how much. It cannot say where.
Read moreRead less about The line that lost its name
Lawrence Livermore National Laboratory (LLNL) draws that chart each year with the Department of Energy. It follows the energy from the fuel to the work it does. The July 2026 edition puts the energy the United States used in 2024 at 94.6 quads, or quadrillion Btu. Of that, 32.34 quads became energy services. The other 62.27 quads sit under rejected energy: 65.8%, about two thirds of everything the nation used.
That grey box has a history. The 2002 chart called it lost energy and named the stream that fed it from the power sector: electrical system energy losses, 26.3 of about 97 quads, the plants’ heat and the wires together. Later editions keep the band but drop its name, and call the box rejected energy. A reader can still see the band flow in from electricity generation, beside an estimate for each sector. Nothing on the chart says what it is.
The electricity stream is the one the chart works out from two reported totals: the retail electricity delivered, divided by the energy put into generating it. In 2024, 32.77 quads went in and 13.56 quads reached customers. The other 19.21 quads, 58.6% of the input, are rejected, and the chart cannot say how much went at the plant, how much the plant used itself and how much the wires took.
By the EIA’s heat rates, most of that is heat lost in the plants’ heat engines, and that is another story. Ours begins with the electricity that leaves the plant: what the wires take, what the meter does not see, and what the machines turn into heat.

56.2
2002: lost energy 56.2 of about 97 quads, with electrical system energy losses drawn as a stream of their own, 26.3 quads

56.13
2010: rejected energy 56.13 of about 98 quads, the electricity band drawn but unnamed

67.5
2019: rejected energy 67.5 of 100.2 quads
The line that lost its name. In 2002 the chart named the stream electrical system energy losses. From 2010 on, the charts leave the stream unnamed and call the box rejected energy. Energy flow charts by Lawrence Livermore National Laboratory.
The long way down
5% to 8%
of the electricity sent out is lost between the plants and the customers: about 5% in the United States by the EIA’s count, 8% across the world by the World Bank’s
Electricity leaves the plant at high voltage and steps down toward the customer. Line after line, transformer after transformer, each keeps a share as heat. American grids lose about one unit in twenty. Across the world, nearer one in twelve.
Read moreRead less about The long way down
The Energy Information Administration (EIA) estimates that 185.5 TWh were lost between the plants and the customers in 2024, in its State Electricity Profiles, Table 10. Following the EIA’s own method, that is 4.41% of the electricity transmitted and distributed. The year before, the same table estimates 171.6 TWh, or 4.20% on the same method. The estimate grew in both size and share. Asked the question plainly, the EIA answers that the losses “averaged about 5%” from 2018 to 2022.
Worldwide the share is higher. In 2014, by the World Bank’s count, 8.3% of all the electricity generated on earth was lost between the plants and the customers: 1,980 TWh, as a 2017 study of the European grid reports it.
That study models a unit of electricity going down the European grid, through seven voltage levels and the transformers between them. A customer connected at the top of the chain, above 345 kilovolts, loses about 2.4% of what the plant sent. A home at the bottom, on a cable under 450 volts, loses about 14.9% in the study’s model, which also counts electricity delivered but never recorded in sales. Two thirds of the technical loss is in the lines and one third in the transformers, and 70 to 75% of all the grid’s losses sit in the distribution grid, the last stretch to the customer.
The physics is simple and unforgiving. A wire’s loss rises with the square of the current through it: twice the current, four times the heat. A transformer’s core loses all day whether or not anyone is using power. So the losses climb with the load, peak when demand peaks, and fall on whoever sits farthest from the plant.
Where the rest goes
a third to a half
of the electricity that reaches a home, an office or a factory is counted as rejected at the point of use, by the chart’s own assumptions. That stretch is where we work.
Follow a hundred units of energy into the power plants. Most are gone before the first wire. The wires take two. Four in ten reach a meter, where the chart writes off a third to a half in use.
Read moreRead less about Where the rest goes
Put the numbers side by side. Of the 32.77 quads of energy that went into making electricity in 2024, 0.63 quads were lost on the wires, the EIA’s 185.5 TWh. The other 18.58 quads of the rejected energy were gone before the wires, almost all of it at the plants and in their own use: 56.7% of everything that went in, against 1.9% on the wires. What reached a meter was 13.56 quads, 41.4% of the input.
Then the chart keeps counting. By its own note it assumes that homes and offices put 65% of the energy delivered to them to use and industry 49%, and it counts the rest as rejected: 35% and 51% of the electricity that arrives, written off at the point of use without a measurement.
So of a hundred units of energy put into making electricity, about fifty-seven are gone at the plant, two on the wires, and forty-one arrive. Of those forty-one, the chart writes off fourteen to twenty-one more in use. Twenty to twenty-seven units do work.
The plant’s share is thermodynamics, and the wires belong to the utility. The third to a half written off after the meter is the stretch the chart estimates rather than measures. An estimate is a promise that the measurement will come. We mean to keep that promise. That stretch is where our controllers connect: at the panel, beside the loads, on the part of that current that poor power quality turns into heat.
The reactive, harmonic and unbalanced current they supply there, within their rating, does not pass up the feeder, so the wires carry that much less. We work for the day that stretch is measured, not estimated. We work for the day its losses carry their names again. We work for the day the chart can say where the grey box goes.
Inside the fence
93.0%
efficiency of a 100 hp motor at full load on a supply with 2.5% voltage unbalance, against 94.4% balanced. The difference is heat.
The utility ledgers above close at the meter. The physics does not. It goes on in the facility’s own transformers, cables and motors, where the current that does no work still makes heat. That is where our controllers connect.
Read moreRead less about Inside the fence
The chart estimates the loss beyond the meter by sector, not by cause. The EIA’s count and the European study stop at the customer’s connection. The electricity that is metered and paid for counts as delivered, and the ledgers close.
Inside the fence the current that does no work still has to be carried. A British trade guide to power factor correction works the example. A plant drawing 1,000 kW at a power factor of 0.8 pulls 1,250 kVA through its supply, 1,740 amperes a phase, where the same work at 0.99 takes 1,414. Those extra amperes heat cables, and any transformer the site owns, on its side of the meter as well as the utility’s, and the guide notes that a site at 0.7 needs a supply about 40% larger than one at unity. The current that magnetises a motor, typically 20 to 60% of its full-load current, flows whether the motor is loaded or not. Without it the motor has no magnetic field and makes no torque, as an October 2026 paper in In Compliance Magazine puts it.
Distortion and imbalance add to it. A 2023 study from North China Electric Power University wrote out the arithmetic for a low-voltage network. Unbalanced phases add a term to the winding loss that balanced phases do not have. Harmonic currents lose more than their share, because high frequencies crowd to the surface of a conductor. The third harmonic from each phase adds in the neutral, a conductor often sized at half the phase.
The record on motors is plain.
- Imbalance. A 2012 Department of Energy tip sheet cites a test by the Washington State University Energy Program. A 100 hp motor at full load ran at 94.4% efficiency on a balanced supply and 93.0% at 2.5% voltage unbalance. Current unbalance can be six to ten times the voltage unbalance, and the motor runs hotter. The 2008 motor sourcebook adds that at 5% voltage unbalance, phase currents can differ by as much as 40%. The imbalance reaches the utility’s feeder too: the Electric Power Research Institute reported in 2008 that bringing phase imbalance from 25% to below 10% can cut primary line losses by 1.5% to 2%. It cites research by the Northwest Energy Efficiency Alliance.
- Harmonics. The motor standard of the National Electrical Manufacturers Association, MG 1-2016 Part 30, says harmonics increase a motor’s electrical losses and lower its efficiency. It sets a derating curve and gives no loss percentage. The sourcebook adds that harmonics increase the heat generated in motor windings.
- Low power factor. The same sourcebook puts a typical induction motor near a power factor of 0.85. The extra current that a low power factor draws causes resistive losses that waste energy. The sourcebook notes that utilities charge for a power factor under 0.90.
- Heat in the windings. The sourcebook gives typical shares: resistive losses in the stator windings are 25% to 40% of a motor’s losses, and in the rotor 15% to 25%. Extra current raises these losses.
These losses sit after the meter, in the panels and the machines. That is where our controllers connect.
The space between the measurements
A meter does what it was built to do. It averages electricity over a window. Many of the changes that matter happen inside one cycle. Grid engineers now describe a related blind spot in the instruments that watch data centers.
Read moreRead less about The space between the measurements
Meters read electricity by averaging. A root-mean-square reading folds a window of the wave into one number. At 60 Hz each cycle lasts 16.7 milliseconds, and the current changes inside it, so an averaging reading hides what happens inside one cycle. The VectorQ2 and VectorQ5 sample the wave 1,000 or more times per cycle and respond in under 5 microseconds, by rating.
Our story says the waste hid in the space between the moments a meter can measure. Grid engineers now describe a related gap. In April 2026, the North American SynchroPhasor Initiative (NASPI) released a report on measuring the oscillations of data centers. The Department of Energy’s Office of Electricity summarized it on May 28, 2026.
The report found that the filtering inside phasor measurement units can miss or misrepresent the high-frequency oscillations that AI workloads create. The report concludes that combined phasor and point-on-wave monitoring is the most reliable pathway for assessing oscillations from large loads.
A May 2026 book from Wiley-IEEE Press argues that misunderstandings of reactive power, apparent power and phasors persist, and that some critical measurements are not fit for purpose. The book is Measuring the Electric Grid: Mysteries Explained, by Harold Kirkham and co-authors.
What we have measured
A customer switched our controller off and on, read his UPS displays and reported about a fifth less power use. We publish his account beside our instrument’s reading, with the Army manual’s rule for sizing a generator behind a UPS.
Read moreRead less about What we have measured
Our record includes a customer’s account. In 2018 the chief executive of a company’s information technology unit described a test of our controller in the company’s data center: on switch-on, power use dropped about 20% and server temperature about 20 degrees Fahrenheit, which he checked on his own UPS displays. That is a customer’s account, not a measurement. Our instrumented assessment of two server racks in 2016 found less current and apparent demand at the connection and no drop in active power, and we publish both.
Distortion travels back toward the source. A standby generator, with a higher reactance than a utility transformer, feels the same kind of distortion more. The 2001 Army manual sizes a standby generator at least 1.6 times the input kilowatts of a six-pulse UPS, to contain waveform distortion. That is a cost too. It is paid in steel: a larger machine, bought to keep the waveform clean.
Recognition
2017
Popular Mechanics
Breakthrough Award for the technology, confirmed independently by Vox in 2018.
2018
NC TECH
Won the showcase at the State of Technology Conference, on the theme of artificial intelligence. Vox noted the win in June 2018.
2018
Vox
A feature by David Roberts, with two named, independent witnesses.
2020
UK Ministry of Defence
Funded trials with Underwriters Laboratories as the independent verifier, and reported typical mixed-load efficiency gains of 25%. Highly Commended in the Sanctuary Awards, published by GOV.UK in March 2021.
Today
3DFS
Controllers built in-house in Chatham Park, North Carolina.
History
The record, year by year
2010
We formed 3DFS on October 10, 2010.
2015
We announced a 10,000 square foot manufacturing facility at Chatham Park.
2016
In February 2016 we built Calibri EX to advance our research in power electronics and power quality. The University of North Carolina at Chapel Hill used it in neuroscience and physics research. Forbes published a contributor profile by Matt Hunckler on October 21, 2016, and reported the company was self-funded.
2017
Popular Mechanics gave the technology a Breakthrough Award in 2017, and Vox confirmed the award independently in 2018.
2018
Duke Energy’s Joules Accelerator selected 3DFS as one of eight companies in its program. We won the showcase at the NC TECH State of Technology Conference in May 2018, one of six North Carolina companies on the theme of artificial intelligence. Vox published a feature by David Roberts in June 2018, with two named, independent witnesses. It noted the showcase win.
2020
The UK Ministry of Defence funded trials, with Underwriters Laboratories as the independent verifier, and reported typical mixed-load efficiency gains of 25%. The project received a Highly Commended Sanctuary Award, published by GOV.UK on March 16, 2021.
2021
The Chatham News + Record reported in July 2021 that the team had grown to 15. We have not published a headcount since.
2021
BRITE Innovation Review, in its Spring 2021 issue, and Army Technology, on April 1, 2021, covered the trial and the mechanism behind it, in interviews with the trial team.
2023
We published the Optimized Electrification whitepaper, formalizing the Power Quality Rating and the SDE methodology.
2025
VectorQ2 and VectorQ5 are in production at Chatham Park. The manufacturing floor opened to contract work in electronics, precision fabrication and materials science.
2026
The market arrived at the problem: ride-through became a rule. NOGRR282 of the Electric Reliability Council of Texas (ERCOT) is in force from August 1. The Federal Energy Regulatory Commission (FERC) ordered the North American Electric Reliability Corporation (NERC) to file national standards for computational loads by December 31, 2026. We restated our mission in public: Why We Exist, above.
How we work
Engineering and production share one facility. Electronics, embedded software and assembly stay in house.
How we sell
We sell through pilots, not a cart. Each pilot starts with a measured baseline and ends with an instrumented result.
How we claim
We name the party behind any measured result. We say so when we cannot.





































































