---
title: "Request a site analysis"
url: https://3dfs.com/site-analysis
description: "An engineer reads the facility facts and replies with what we would measure first. A pilot that fits starts with an on-site network analysis."
updated: 2026-10-15
---

# Request a site analysis

> An engineer reads the facility facts and replies with what we would measure first. A pilot that fits starts with an on-site network analysis.

## Site analysis, pilot and deployment

Three engagement options take a facility from a question about its electrical network to a VectorQ fleet it owns: an analysis, a pilot, a deployment. Each one ends in a report with the numbers that justify the next.

---

## Analysis

An engineer reads the electrical drawings, identifies where correction would do the most and sets the key performance indicators for tracking the improvement and the efficiency gains.

The analysis weighs the power distribution, the load requirements and the layout of the infrastructure, so Software-Defined Electricity lands where it counts.

- The outcome: a report naming the integration locations and the key performance indicator improvements expected from a single-location deployment.

---

## Pilot

A pilot measures Software-Defined Electricity in the production environment, beyond the electrical parameters. It relates the corrected network to the critical processes and to the end product.

Third-party test equipment and on-site measurements take the key integration locations before and after the controllers go in, so the improvement is quantified and the indicators are documented.

- The outcome: a report that records the measured improvements, the indicator gains and their correlation with process and product quality.
- The scope: a single location, or a broader study of what the technology does across an industry.

---

## Deployment

Ownership of the VectorQ series is shaped to the application, from a small batch to an enterprise-wide fleet, as a purchase or a lease.

3DFS configures the controllers for the application and supports the owner through the deployment.

## Where to start

Start with the analysis. The request form is on the contact page, with the facility facts an engineer reads first: voltage and phases, the installed correction equipment, and the symptoms seen on site.

[Request a site analysis](https://3dfs.com/contact#form-site-analysis)
